Back
Terronera ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
Terronera
ASSET TYPE
Development
Development METALS & MINERALS
Gold, Silver
DEPOSIT TYPE
Low-sulphidation epithermal veins
SPECIFIC LOCATION
Puerto Vallarta, Mexico
CURRENT ASSET STATUS
  • Permitting
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources: NI 43-101
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Gold 0 k mt 0 g/t 0 k oz 0 g/t 2.94 k mt 1.65 g/t 156 k oz 0 g/t 1213 k mt 1.39 g/t 54.3 k oz 0
Silver 0 k mt 0 g/t 0 m oz 0 g/t 2.94 k mt 211 g/t 19.91 m oz 0 g/t 1213 k mt 218 g/t 8.5 m oz 0
Mineral Reserves: NI 43-101
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0
Silver 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0 g/t 0
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Gold (k oz) Produced792
00000000Silver (m oz) Produced932
00000000Gold (k oz) Sold791
00000000Silver (m oz) Sold931
00000000Gold Recovery (%)794
00000000Silver Recovery (%)934
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRGold (oz)Silver (oz)
Feasibility Highlights
Date of Assessment
Jun 13, 2026
ACCESS TO PROPERTY
ROAD ACCESS
  • Year-round access
  • Paved road
AIRPORT ACCESS
AIRPORT NAME
ESTIMATED TRAVEL TIME
SITE VISIT AVAILABILITY

Travel Description

One hour on a paved highway to the town of San Sebastián del Oeste.

FreeText