Bolañitos Mine ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
Bolañitos Mine
ASSET TYPE
Operating
Operating METALS & MINERALS
Gold, Silver
DEPOSIT TYPE
Low-sulphidation epithermal veins.
OPERATOR
Endeavour Silver
SPECIFIC LOCATION
Guanajuato, Mexico
CURRENT ASSET STATUS
  • Producing
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources: NI 43-101
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Gold 101.3 k mt 2.13 g/t 6.94 k oz 0 g/t 940.7 k mt 1.94 g/t 58.61 k oz 0 g/t 12917 k mt 2.74 g/t 113.9 k oz 0
Silver 101.3 k mt 140 g/t 0.46 m oz 0 g/t 940.7 k mt 153 g/t 4.64 m oz 0 g/t 12917 k mt 171 g/t 7.1 m oz 0
Mineral Reserves: NI 43-101
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Gold 205.7 k mt 2.6 g/t 17.4 k oz 0 g/t 172.6 k mt 2.73 g/t 15.15 k oz 0 g/t 0
Silver 205.7 k mt 125 g/t 0.83 m oz 0 g/t 172.6 k mt 101 g/t 0.56 m oz 0 g/t 0
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Gold (k oz) Produced792
00000000Silver (m oz) Produced932
00000000Gold (k oz) Sold791
00000000Silver (m oz) Sold931
00000000Gold Recovery (%)794
00000000Silver Recovery (%)934
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRGold (oz)Silver (oz)
Date of Assessment
Jun 13, 2026