Back
Guanaceví Mine ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
Guanaceví Mine
ASSET TYPE
Operating
Operating METALS & MINERALS
Gold, Silver
OPERATOR
Endeavour Silver
SPECIFIC LOCATION
Guanaceví, Mexico
CURRENT ASSET STATUS
  • Producing
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources: NI 43-101
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Gold 175.5 k mt 0.54 g/t 3.09 k oz 0 g/t 2313.2 k mt 0.78 g/t 58.22 k oz 0 g/t 1150.52 k mt 0.72 g/t 26.67 k oz 0
Silver 175.5 k mt 306 g/t 1.73 m oz 0 g/t 2313.2 k mt 277 g/t 20.57 m oz 0 g/t 1150.52 k mt 308 g/t 11.39 m oz 0
Mineral Reserves: NI 43-101
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Gold 107.5 k mt 0.52 g/t 1795 k oz 0 g/t 798 k mt 0.45 g/t 11.74 k oz 0 g/t 0
Silver 107.5 k mt 254 g/t 0.88 m oz 0 g/t 798 k mt 205 g/t 5.26 m oz 0 g/t 0
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Gold (k oz) Produced792
00000000Silver (m oz) Produced932
00000000Gold (k oz) Sold791
00000000Silver (m oz) Sold931
00000000Gold Recovery (%)794
00000000Silver Recovery (%)934
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRGold (oz)Silver (oz)
Date of Assessment
Jun 13, 2026